Southern Water have two upcoming works scheduled taking place in Copse Lane.

These road closures are to enable Southern Water access to replace their mains asset infrastructure, having been identified by SW from the number of times the mains have burst in this location. The initial works are for 1141 metres replacement mains pipes to be installed.

The works are planned for August 18th-October 27th 2025 and October 20th-Feb 13th 2026.

A factsheet on utility work on the highways can be found here.

Map showing Copse Lane roadworks planned for October.